CommercialBox Hill · Commercial · 2025
Fourteen-Level Office Lobby Refurbishment
A fourteen-level office lobby and lift core repainted across four consecutive nights with zero disruption to weekday tenant access.
- Silver Thaw
- Monument
- Safety Yellow
Offices, retail, strata and hospitality painted around your trading hours.
The short answer
Commercial painting is judged on programme as much as finish. Work is staged in zones, scheduled outside trading hours where needed, documented with site-specific SWMS, and specified in fast-recoat low-odour products so the space returns to service the same night.
Commercial painting is a logistics exercise as much as a trade one. Tenants need access, retail needs to trade, and a body corporate needs a program it can communicate to residents weeks in advance.
We staging our commercial programs in zones, work nights and weekends where required, issue site-specific SWMS and inductions, and provide a nominated supervisor who reports progress against the schedule daily.
Typical specification: Dulux Envirosolutions and Precision Coatings systems selected for wash-down durability and rapid return to service.
Tell us a little about your painting project and we'll get back to you.
Recent finishes
Photographs from our own commercial jobs — open-plan interiors, reception areas, walls, ceilings, doors and trim.





How we prepare
Preparation is where the money either goes or gets saved, and it is the part you cannot see once the job is finished. This is exactly what happens before colour goes on.
A zone-by-zone program is issued with dates, access windows and notification requirements so tenants, residents or staff know exactly when their area is affected.
Site-specific SWMS, inductions, insurances, working-at-heights certification and traffic management are supplied before the first day, not chased afterwards.
Occupied assets carry decades of patch repairs and unknown coating histories. We test adhesion and existing sheen so a recoat does not lift the layers beneath it.
Furniture, stock and equipment are relocated and protected by our crew, and each zone is cleaned, re-set and photographed before it is handed back.
Occupied tenancies
Low-odour, low-VOC systems with a fast recoat window so two coats can go on inside a single night shift.
High-traffic corridors and lifts
Scuff-resistant washable coatings rated for repeated cleaning, so common areas hold their appearance between painting cycles.
Car parks and plant rooms
Line-marking paint, anti-slip coatings and DTM enamels on balustrades, bollards and handrails.
Wet and clinical areas
Anti-microbial and steam-resistant systems for medical suites, hospitality kitchens and change rooms.
Hold us to these. They are written into every commercial painting proposal we issue.
Every commercial painting proposal we issue names the products, the number of coats and the preparation steps above, so you can compare it line by line against any other quote.
Request a written specificationCompare the options
The right shift pattern is a trade-off between cost, disruption and speed. This is how the three options usually compare on an occupied site.
| Program | Disruption to trade | Relative cost | Best suited to |
|---|---|---|---|
| Standard hours | High | Base rate | Vacant tenancies, pre-handover fit-outs |
| After hours / evenings | Low | +15–25% | Retail, offices, medical suites |
| Night shift | Minimal | +25–40% | Hospitality, supermarkets, 24-hour assets |
| Weekend block | None midweek | +20–30% | Strata common areas, schools, car parks |
Recent projects
Each case study documents the condition we started with, the preparation, the products, the colours and the finished result.
CommercialBox Hill · Commercial · 2025
A fourteen-level office lobby and lift core repainted across four consecutive nights with zero disruption to weekday tenant access.
CommercialGlen Waverley · Commercial · 2024
Eight consulting rooms and a waiting area repainted over two weekends in an anti-bacterial, wipe-down system with zero clinic downtime.
Related articles
Our Knowledge Centre explains the decisions behind this work in full — costs, products, preparation and the mistakes that cause early failure.
Commercial Painting · 3 min read
A defensible commercial painting specification names the coating system per substrate, defines surface preparation standards, sets film build in microns, states environmental limits for application, and ties progress claims to inspected hold points.
Read the guideCommercial Painting · 3 min read
VOC stands for volatile organic compounds — solvents released as paint cures. Standard interior acrylics contain 50–100 g/L, low-VOC products under 50 g/L, and near-zero products under 5 g/L, which is what schools, healthcare and occupied offices should specify.
Read the guidePaint Brands · 3 min read
Washability describes a paint's ability to survive gentle sponging without burnishing, while scrubbability is a measured laboratory standard counting abrasion cycles before film failure — premium interior acrylics typically survive 5,000–10,000 cycles versus 500–1,500 for economy lines.
Read the guidePainting Costs · 3 min read
A trustworthy painting quote names the product line for every surface, states coat counts separately for ceilings, walls, trim and doors, lists each preparation stage, defines exclusions, and attaches a current public liability certificate and a written labour warranty.
Read the guideQuestions
Real questions from Melbourne homeowners, answered the way we answer them at the kitchen table.
Question we have not covered? Send us photos with your enquiry and we will answer it against your actual surfaces, not a general case.
Ask us with photosWhere we work
Choose your suburb for local detail on housing stock, exposure and typical scope.
Also consider
Walls, ceilings, cornices and joinery finished to a furniture standard.
Weather-engineered systems for Melbourne's brutal seasonal swings.
Restoration-grade coatings that reset your roof's next twenty years.
Boundary fences, gates and screens brought back to a crisp line.
Tell us about your painting project and a project manager will be in touch.